Grid code and standards

What Italy actually asks of your plant.

This is the first question most manufacturers ask us, so here it is in one place: the standards that decide what can be connected, with which protections, and with what paperwork.

ReferenceWhere it applies
CEI 0-16Technical rule for connection to medium voltage networks. Sets the connection scheme, the general protection and interface protection systems, and the content of the operating agreement.
CEI 0-21The same ground for low voltage connections, on smaller installations.
CEI EN 61439-1/2Construction and verification of power and distribution assemblies. Every board leaving our workshop is built to it.
CEI 64-8Electrical installations of buildings: protection, isolation and coordination with the existing plant distribution.
CEI EN 62933The series covering electrical energy storage systems: parameters, safety and system requirements.
Terna Grid CodeRequirements for plants providing services to the electricity system, driving the regulation performance asked of the installation.
IEC 61850 / Modbus TCPProtocols for communication between EMS, protection relays, switchgear and plant supervision.
Deliverables

What you are left holding at handover.

Drawings in an open format

Schematics delivered in a format that opens without a proprietary licence. If you change supplier later, the drawings remain yours and usable.

Assembly documentation

Verifications, tests and declarations required by CEI EN 61439, with the full bill of installed components.

Commissioning records

Functional tests, protection settings and the interface commissioning report agreed with the distribution operator.

Send us a connection point.

With the single-line diagram and the delivery point data we can tell you whether the route works before it becomes a site problem.